Installation instructions S-HR series page 4
1 Introduction
These instructions describe the functioning, installation,
use and primary maintenance of ATAG central heating
units for United Kingdom and Ireland. Where necessary
different regulations of each country are separately
described.
These instructions are intended for the use of Corgi
registerd installers or registered Bord Gais installers in
connection with the installation and putting into operation
of ATAG units. It is advisable to read these instructions
thoroughly, well in advance of installation. Separate
instructions for use are supplied with the unit for users of
ATAG central heating units. ATAG is not liable for the
consequences of mistakes or shortcomings which have
found their way into the installation instructions or user’s
manual. Further, ATAG reserves the right to alter its
products without prior notification.
When delivering the unit, give the customer
clear instructions concerning its use; present
the customer with the user’s manual and card.
Each unit is fitted with an identification plate. Consult the
details on this plate to verify whether the unit is
compliant with its intended location, e.g.: gas type,
power source and exhaust classification.
On completion of the installation the installer or
commissioning engineer must fill out and complete the
Benchmark commission section of the boiler log book and
hand to customer or end user for future record keeping.
The Benchmark log book must also be filled out and
completed by the service agent following each service call,
and returned to the customer. A copy of the Benchmark
commissioning certificate must be returned to ATAG
Heating UK Ltd along with the warranty registration card to
register the appliance for the standard warranty benefits.
2 Regulations
The following regulations apply to installation of ATAG
central heating units:
Legislation and Regulations.
Gas Safety (Installation and Use). All gas appliances must
by law, be installed by a competent person, eg. Members
of CORGI and in accordance with the current Gas Safety
Regulation. Failure to install appliance correctly could lead
to prosecution.
In addition to the above regulations this appliance must be
installed in compliance with the current IEE Regulations, the
Building Standards (Scotland Consolidation) Regulations.
Regulations and bye laws of the Local Water Authority and
the Current Health and Safety Regulation.
Ireland:
- Irish standard 813
- Domestic gas installations
The current, Electricity at Work Regulation must be
complied with and also be in accordance with the
relevant and current editions of the British Standards.
The ATAG Blauwe Engel boiler is a certified appliance
and must not be modified or installed in any way contrary
to this Installation Manual.
Manufactures instructions must not be taken in any way
as overriding statutory obligations.
The ATAG Blauwe Engel is a central heating unit with an
optional integrated hot water function. These units must
be connected according to these instructions and all
installation norms in respect of the part of the unit to be
connected.
Observe the following rules of safety:
- All work on the unit must take place in a dry
environment.
- ATAG units may never be in operation without their
housing, except in connection with maintenance or
adjustments (see Chapter 13 and 14).
- Never allow electrical or electronic components to
come into contact with water.
Carry out the following tasks in connection with
maintenance, etc. to an already-installed unit:
- Shut down all programmes
- Close the gas tap
- Remove the plug from the wall socket
- Close the stop cock of the unit’s intake connection
Take note of the following when maintenance or
adjustments are needed:
- The unit must be able to function during these
activities; for this reason, the unit’s supply voltage,
gas pressure and water pressure must be
maintained. Ensure that these are not a source of
potential danger during these activities.
Following maintenance or other activities;
always check the installation of all parts
through which gas flows (using leak-search
spray).
Following maintenance or other activities,
always replace the housing and secure it with
the screw behind the door at the front of the
casing.
4

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für ATAG Blauwe Engel wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von ATAG Blauwe Engel

ATAG Blauwe Engel Bedienungsanleitung - Holländisch - 2 seiten

ATAG Blauwe Engel Installationsanweisung - Holländisch - 40 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info