646321
6
Zoom out
Zoom in
Vorherige Seite
1/66
Nächste Seite
ULTRAMAX PB 65 - 120
6 L290 ©MHS Boilers 13/12/2010
The following Codes of Practice are also applicable: -
BS 5449:1990 Specification for forced circulation hot water central heating systems for domestic premises.
BS 6644:2005 Specification for gas fired hot water boilers of rated inputs between 70kW (net) and
1.8MW(net) (2
nd
and 3
rd
family gases).
BS 6880:1988 Code of Practice for low temperature hot water heating systems of output greater than 45kW.
Parts 1,2 & 3.
BS 6891:1988 Specification for installation of low-pressure gas pipework of up to 28mm (R1) in domestic
premises (2
nd
family gases).
BS 7593:2006 Code of Practice for treatment of water in domestic hot water central heating systems.
BS 7671:1992 Requirements for electrical installations. IEE Wiring Regulations. Seventeenth Edition
CISBE Guide reference sections B7, B11 and B13.
CP342 Part 2: 1974 Code of Practice for centralized hot water supply.
IGE/UP/1 or 1A Gas Tightness Testing & Purging of Commercial Industrial Gas Installations
IGE/UP/2 Gas installation pipework, boosters and compressors on Industrial and Commercial premises.
IGE/UP/4 Commissioning of gas fired plant on industrial and commercial premises.
IG/UP/10 edition 3 Installation of gas appliances in Industrial and Commercial premises.
Part 1: Flued appliances.
1.3 Hot Water Quality
Composition and quality of the system water directly affects the performance of the entire system and the
longevity of the boiler.
For the initial filling and subsequent refilling of the system, under normal circumstances, regular tap water with
a pH value between 7 and 8 can be used unless the water is highly corrosive (chloride content > 150 mg/l) or
very hard (<1dH, hardness level IV). A tap water analysis can be requested from the local water utility
company. If the specific system volume is greater than 20 litre/kW of heating power (for example through
installation of a heating water buffer reservoir) the maximum permissible introduction of calcium via fill and
replacement water must be determined according to the calculations specified in VDI Guidelines 2035.
Softening of the fill water may have to be performed if necessary.
1.4 Unknown Water Quality and Exchanger Systems
Quite frequently, water contains materials and additives, which affect function and longevity of the Heat
exchanger. Therefore, either
Prior to exchanging the equipment, heat up the old system and drain completely afterwards.
OR
After exchanging the equipment, rinse the heating system carefully.
1.5 Existing System
For old systems, floor heating systems and problematic system water, MHS Boilers recommends the
installation of a plate heat exchanger to segregate the primary and secondary systems.
1.6 Scope of Delivery
Ultramax PB condensing boiler with switch panel, including exterior sensor with weather-regulated
heating control for 1 heating circuit and hot water conditioning
Documentation.
Criterion
Effect upon Deviation
pH
Risk of corrosion for boiler components and heating system
Hardness
- increased calcium deposits
- reduced longevity of boiler
Chloride
content
Corrosion of alloy materials
6

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Elco Ultramax PB 65 - 120 wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info