654220
6
Zoom out
Zoom in
Vorherige Seite
1/20
Nächste Seite
Pagina 6
English
DESCRIPTION:
1. Cold water tank
2. Cup warmer
3. Indicator light: steam ready
4. Steam/hot water knob (on the right side)
5. Filter holder retaining ring
6. Steam/hot water arm
7. Removable water drainage tray
8. Filter holder
9. Single cup filter
10. Two cup filter
11. On/off switch (on the left side)
12. \
13. Coffee/hot water/steam lever switch
14. Indicator light: coffee ready
15. Coffee press/tamper
16. Measuring spoon
17. Thermometer
18. \
19. Removable water tank cover
20. Water level indicator
21. \
22. Pump lever switch
USER INSTRUCTIONS:
Starting of the machine:
1. Remove the machine from its packing and make sure all packing parts have been taken off (including the
protection bags).
2. Lay the machine on a flat and steady surface far away from hot places and from the water taps.
3. Remove the water tank cover (19) on the top of the machine and take out the water tank (1) paying attention
not to damage the water tubes inside the tank.
4. Fill the tank (1) with cold water.
5. Replace the water tank back in the machine and check that the water tubes are not bent and that the filter is
well set on one of them; reposition the tank cover (19).
6. Plug in the machine in the mains. Make sure that the wall socket has the right voltage.
7. Place the filter holder (8) under the brewing group (5) and turn it from the left to the right. Leave it there so
that it can get warm and it gets ready for use.
8. Turn the machine on by pushing the on /off switch (11). The indicator light of the switch (11) comes on to
confirm the power supply.
9. Open the steam/hot water knob (4).
10. Position the lever switch (13) on hot water mode and lift the pump switch up (22).
11. Once water comes out of the steam nozzle (6), push the pump switch (22) down and close the steam/hot
water knob (4).
12. After completing all these operations, leave the machine on.
NB: The machine is provided with a thermometer that indicates the boiler temperature for coffee and steam
function.
Preparing an espresso:
13. Check that the water tank (1) has been filled in with water by looking at the water level indicator (20).
14. Press the on/off switch (11): the indicator light of the switch (11) will come on. Do this operation only if the
machine is off. If it’s on pass to the following point.
15. As soon as the indicator light (14) goes off, the machine is ready for use.
16. Fit the single cup filter (9) or the two cup filter (10) into the filter holder (8) that has been warmed up by
leaving it attached to the brewing group as described in point 7.
17. Fill the filter with ground coffee by means of the supplied measure spoon (16): 1+ ½ measuring spoonful (16)
= 1 coffee cup - 3 measuring spoonful (16) = 2 coffee cups. Every time you fill the filter with a spoonful of
coffee, press the coffee with the coffee press/tamper (15) before proceeding to fill it with the next spoonful
and make sure that there are no coffee rests on the filter border.
18. Insert the filter holder (8) in the brewing group ring (5), turn it from left to right with force, and then put the
cup on the removable water drainage tray (7).
19. Position the lever switch (13) on coffee mode and lift the pump switch (22) up.
20. Once you get the desired quantity of coffee, push the pump switch (22) down.
21. Remove the filter holder (8) and throw away the coffee grounds. Make sure that the filter holder is clean and
reposition it in the brewing group to warm up again.
Steam:
22. Check that the water tank (1) has been filled in with water by looking at the water level indicator (20).
23. Press the on/off switch (11): the indicator light of the switch (11) will come on. Do this operation only if the
machine is off. If it’s on pass to the following point.
24. Position the lever switch (13) on steam mode.
25. The lights (14) and (3) will go on and once the indicator light (3) goes off the machine is ready for a good and
constant steam distribution. ATTENTION: if you’ll wait to much and both lights will go off, the steam quantity
will be less constant.
26. Open the steam/hot water knob (4). First some water will flow out and then the steam.
27. Put the cup with the desired infusion under the steam tube (6) and turn the knob (4).
28. Once the drink has been suitably frothed, close the steam/hot water knob (4).
6

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Lelit Gilda PL41 Plus wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info