735237
2
Zoom out
Zoom in
Vorherige Seite
1/2
Nächste Seite
KL08NSB
Installation and Wiring Guide
www.salus-controls.com Technical Helpline +44 (0) 1226 323 961
1
Remove the plastic cover. Open (and
close) the four white screws with a
quarter turn only. Note that screws on
opposite sides turn in the opposite
direction.
2
Remove the white terminal connection
board.
3
Attach the back of the KL08NSB to the
DIN rail or wall.
5
Clip all power and thermostat cables
into their correct positions. The
following shows the power, zone 1,
and 2 thermostat cables in position:
6
Replace the white terminal connection
board.
7
Bend over and push the power wires
into the round power holes.
8
Bend over and push all thermostat
wires into the round holes at the top
of the KL08NSB.
9
Push the actuator wires into the round
holes at the bottom of the KL08NSB.
You can connect up to four actuators in
each zone.
10
Make sure there is a fuse in the
fuse holder.
11
Set the actuator and boiler delay
jumpers at the top right of the KL08NSB.
12
Push in the wires for a pump and boiler
(if applicable) at the bottom right of the
KL08NSB.Pump and boiler switching is
volt free.
13
Attach the red strain-relieving strip
using the three screws to secure the
pump and boiler wires to the bottom
side of the KL08NSB.
14
Replace the plastic cover.
15
Switch on mains power supply to the
unit. The red LED comes on.
LED indications
Name Colour Meaning
Power
KL08NSB is supplied with 230V power
Zone 1 actuators
Demand from zone 1 thermostat: actuator open
Zone 2 actuators
Demand from zone 2 thermostat: actuator open
Zone 3 actuators
Demand from zone 3 thermostat: actuator open
Zone 4 actuators
Demand from zone 4 thermostat: actuator open
Zone 5 actuators
Demand from zone 5 thermostat: actuator open
Zone 6 actuators
Demand from zone 6 thermostat: actuator open
Zone 7 actuators
Demand from zone 7 thermostat: actuator open
Zone 8 actuators
Demand from zone 8 thermostat: actuator open
Pump
Pump on
Boiler
Boiler on
Installing and Connecting
the KL08NSB
Use the KL08NSB wiring centre to simply and safely connect
thermostats and corresponding thermal actuators. It can
have three different physical configurations:
Two groups of V30 thermostats, each group having
up to four thermostats.
Three groups of V30 thermostats with a KL04NSB
extension attached, each group having up to four
thermostats.
A VS30 master thermostat controlling up to seven VS35
slave thermostats. For this configuration, you must
make a bridge between grey positions 1-4 and 5-8.
If a KL04NSB extension is attached to the KL08NSB, this
is not included in this configuration and another VS30
master thermostat will control the VS35 slaves connected
to the KL04NSB on zones 9 to 12.
Install the KL08NSB only in dry and closed interior rooms.
Relative air humidity in the room may not exceed 95%.
Clean the KL08NSB only with a dry and soft cloth. Do not
use solvents or aggressive cleaning agents.
4
Cut the power, thermostat and
device cables to length.
Device
Power/Thermostat
50mm
110mm
10mm
10mm
Type of Actuator
The default setting for the type of actuator
is normally closed (NC). To change this setting
to normally open (NO), carefully remove the
jumper and re-insert it in the other position
as shown below. Note that the actuator setting
and thermostat setting must be the same.
Jumper Settings/Positions for Pump/Boiler On/Off Delay
The pump/boiler on delay and the pump off delay
are fixed at three minutes. The default setting for
the boiler off delay is also three minutes, but can
be changed to 15 minutes. To do this, carefully
remove the jumper and re-insert it in the other
position as shown below:
Note: the red reset button to the right of the
boiler delay jumpers. Using a suitable tool, press
this button at any time to reset the KL08NSB
back to factory default settings.
2

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Salus KL08NSB wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info