Electrical installation
Electrical installation work must only be performed
by a qualified electrician. This work must be
carried out in accordance with the regulations
according to IEC 60364-7-701 (corresponding
to VDE 0100 Part 701) as well as all national and
local regulations.
Extension cables are not permitted between the electrical
socket and boiling water storage heater connection.
Installation
Refer to the dimensional drawing on fold-out page I.
Installing fitting, see fold-out page II, Figs. [1] and [2].
Insert fitting in sink hole. This will require leading through the
hoses one at a time.
Note: If there is no need to fit support plate (A), the clamping
length may be increased by 15mm, see Fig. [1].
Mount safety relief valve kit to the waste pipe, see Figs. [3]
to [6].
Mount wall holder, see Figs. [7] and [8].
Mount compression couplings (B) and tighten nipple, see
Fig. [9].
Fix expansion vessel (C) with safety assembly to the wall
holder, see Fig. [10].
Connect filter head and filter, see technical product
information for the filter head and the filter cartridge and fold-
out page III, Fig. [11]. Note direction of flow.
1. Install pressure hose (D) to the inlet of filter head.
2. Install sensor (E) at outlet of filter head. The sensor (E) must
be installed horizontally.
3. Install display unit (F).
Use suitable screws and wall plugs (not included in the scope
of delivery).
Connect filter system, see Fig. [12].
1. Connect adaptor (G) on the cold-water service valve.
2. Screw pressure hose (D) of filter system onto adapter (G).
3. Screw hose (H) onto sensor (E).
Connect storage heater, see Figs. [2] and [13].
Install storage heater taking into consideration the
available hose lengths.
Do not connect voltage supply yet.
Flush pipes thoroughly before and after installation
(observe EN 806).
1. Connect expansion vessel (C), see Fig. [13].
2. Screw hose (H) to expansion vessel (C).
3. Screw storage heater pressure hose (I) marked blue to
expansion vessel (C) using the seals provided.
4. Connect copper pipe (not in the scope of delivery) to
the Ø15mm compression connection (J) of the expansion
vessel (C) and tighten.
Connecting fitting, see fold-out page III, Fig. [14].
1. Screw fitting pressure hose (K) marked blue to adapter (G).
2. Screw red marked pressure hose (L) of the fitting onto the
hot-water service valve.
3. Connect the fitting pressure hose (M) marked 99 °C to
connection (N) on the storage heater.
Open the service valve and check connections for
watertightness.
Filling storage heater with water, see Figs. [15] and [16].
1. Pull button (O1) on handle (O) of fitting outward and turn the
handle anti-clockwise, see Fig. [15].
2. Fill the storage heater until water comes out the spout of
the fitting.
3. Connect voltage supply via mains plug (P), see Fig. [16].
4. Press and hold button (Q) on storage heater for at
least 2 seconds to switch on the storage heater. The red
indicator lamp (Q1) indicates that the storage heater is
switched on.
Important!
The spout must not be fitted with any downstream
resistances in the form of air bubblers (e.g. mousseurs) or
components reducing flow (e.g. restrictors) as these will
result in damage to the storage heater.
Set water hardness at filter head, see fold-out page IV,
Fig. [17].
Set water hardness at bypass setting of filter head to local
conditions, see table column A on page 4.
The relevant water supplier can provide information on the
water hardness.
The bypass value setted to the filter head must also be set on
the display unit (F), see Fig. [18].
Setting the litre specification (factory setting is 600 litre),
see Fig. [18].
The value for the litre specification depends on the water
hardness as per table column B on page 4:
The GROHE Red boiling water system is now fully
installed and ready for operation.
Button Display
Briefly press PROG button
(PRG flashes)
Briefly press RESET button to access
programming for litre specification
(00000 flashes)
Keep pressing PROG button until
required position is reached
(00000 digit flashes)
Keep pressing RESET button until
required digit is reached
(00600 digit flashes)
Keep pressing PROG button to exit
menu (PRG disappears and set value
appears)
The date of installation must be noted on the
maintenance sticker and affixed at a visible location
on the storage heater.
5

Brauchen Sie Hilfe? Stellen Sie Ihre Frage.

Forenregeln

Missbrauch melden von Frage und/oder Antwort

Libble nimmt den Missbrauch seiner Dienste sehr ernst. Wir setzen uns dafür ein, derartige Missbrauchsfälle gemäß den Gesetzen Ihres Heimatlandes zu behandeln. Wenn Sie eine Meldung übermitteln, überprüfen wir Ihre Informationen und ergreifen entsprechende Maßnahmen. Wir melden uns nur dann wieder bei Ihnen, wenn wir weitere Einzelheiten wissen müssen oder weitere Informationen für Sie haben.

Art des Missbrauchs:

Zum Beispiel antisemitische Inhalte, rassistische Inhalte oder Material, das zu einer Gewalttat führen könnte.

Beispielsweise eine Kreditkartennummer, persönliche Identifikationsnummer oder unveröffentlichte Privatadresse. Beachten Sie, dass E-Mail-Adressen und der vollständige Name nicht als private Informationen angesehen werden.

Forenregeln

Um zu sinnvolle Fragen zu kommen halten Sie sich bitte an folgende Spielregeln:

Neu registrieren

Registrieren auf E - Mails für Grohe Red Duo wenn:


Sie erhalten eine E-Mail, um sich für eine oder beide Optionen anzumelden.


Andere Handbücher von Grohe Red Duo

Grohe Red Duo Installationsanweisung - Alle Sprachen - 86 seiten


Das Handbuch wird per E-Mail gesendet. Überprüfen Sie ihre E-Mail.

Wenn Sie innerhalb von 15 Minuten keine E-Mail mit dem Handbuch erhalten haben, kann es sein, dass Sie eine falsche E-Mail-Adresse eingegeben haben oder dass Ihr ISP eine maximale Größe eingestellt hat, um E-Mails zu erhalten, die kleiner als die Größe des Handbuchs sind.

Ihre Frage wurde zu diesem Forum hinzugefügt

Möchten Sie eine E-Mail erhalten, wenn neue Antworten und Fragen veröffentlicht werden? Geben Sie bitte Ihre Email-Adresse ein.



Info